Benefits for the Investors
Section 32 of IT act provides Accelerated Depreciation of 80 % of the invested capital to professionals companies with tax liability
Investors can set off their tax liability on the taxable income to the tune of 80% in the 1st year, and subsequently 20% in the 2nd year
Section 80-IA (sub section 4)of income tax Act, 1961 allows 100% tax waiver on the income generated for any single 10 year period during first 15 years of operational life of a power generation project.
This is valid for projects commissioned till 31st March 2014
Generation based incentives given by the government – Renewable Energy Certificates (REC) allows investors to gain a yield in the form of incentive currently being traded at average price of Rs 12 per unit of electricity generated by the solar power plant
Third Party PPAs with reputed business houses and large industrial groups ( which will be organized by Lobel Solar Power System) allows per unit electricity to be sold at approximately Rs 5 per unit
REC + PPAs results in per unit electricity selling rate of approximately Rs 17 per unit
With an average generation of 16,00,000 units in 1 year, revenue generation in 1 year will be around Rs 272 Lacs
So, Break Even Point (BEP) is around 3-4 years, after which a long & stable income stream is established as solar power plants are deemed FIT & operational for a period of 25 years
Solar plants can be commissioned by us in our Solar park within a time frame of 3-6 months
Registration with the Ministry of Environment & Forests allows participation in “Certified Emission Reduction” (CER) Credits in the international market