Solar Power Policy 2015 dtd 13.08.2015 (G.R. NO. SLR-11.2015-2442-B)
-Policy valid till 31.03.2020
-Capacity: MW Scale (minimum I MW) and KW Scale (minimum I KW)
-Capacity installation: 50% of contracted demand / sanctioned load
-End Use of Electricity: Captive consumption / sales to obligated entities / Third Party sale
-Solar Projects under REC mechanism with sale of power to Distribution Licensees
-Electricity duty exempted
-Concession 50% Cross Subsidy Surcharge & Additional Surcharge for Third Party Sale
-Concession of 50% of wheeling charges and losses
Amendment dated 26.09.2019 in Solar Power Policy 2015 (G.R. NO. SLR-11-2015-2442-BI) – For MSMEs
-Relaxation to MSMEs (Micro, S’nail & Medium Scale Enterprises) sector to install solar capacity (ground mounted or rooftop) without any limit irrespective of their sanctioned load
-MSMEs allowed to set up Solar Projects under Net-Metering mode, Ground Mounted Captive or Third Party Sale mode
-Excess Solar energy to t’e purchased by State DISCOMs at Rs. 1 .75 / kWh
-Electricity Duty, Cross Subsidy Surcharge & Additional Surcharge and Wheeling Charges & Losses applicable as per normal OA Consumers
Wind-Solar Hybrid Policy- 2018 dtd 20.06.2018 (G.R. NO. SLR/11/2017/141/BI)
-Policy valid till 20.06.2023
-Promotion of large scale grid connected wind-solar PV hybrid systems for optimal & ancient utilization of transmission infrastructure, land & reducing variability in RE thus achieving better grid stability
Hybridization
-Type A Projects: Existing (Only AC Integration permitted)
-Type B Projects: New (AC Integration in absence of common RPO & tariff; DC or AC Integration allowed in case common RPO & tariff)
Metering Point
-Receiving end of GETCO s/s
-Separate Metering (Common allowed in case of common RPO & tariff)
-Electricity duty exempted
Policy for Allocation of Govt. wasteland on lease basis for establishing RE Generation Park (Wind Solar Hybrid Park) (G.R. dtd 25.01.2019)
-Technical capacity for RE Hybrid Park – 1000 MW or more having infrastructure facilities
-Eligibility Criteria – Any individual / Unit / Company / Consortium
-Technical Eligibility Criteria – Bidders / Affiliates / Developers should have experience of setting up Wind and/OI Solar Power Project of at least 250 MW
-Financial Eligibility Criteria – Bidders / Affiliates / Developers should have Net Worth Rs 10 Lakh / MW of previous financial year
-Allocation of land on lease basis – 40 years (10 years – developments 30 years – operation) at lease rentals of Rs 15000 p.a. with 15% escalation of every 3 years
-High Power Committee to finalize selection of RE Park Developer taking into consideration various techno-financial criteria viz. Financial Strength. Net Worth, Generation Capacity. Organizational Capacity, Experience, RE Manufacturing base in Gujarat, RE Investment in Gujarat, etc.
-RE Project Development – 50% development at the end of 5 years and 100% completion at the end of 10 years
Scheme for development of Small scale power project -2019 (G.R. dated 06.03.2019)
-Applicability to Small Scale Distributed Solar Projects of size of 500 KW to 4 MW
-Inability of small investors to participate and compete in Competitive bidding process (on account of high minimum capacity requirement)
-Promotion of small investments and projects in decentralized manner
-PPAs to be executed @ average rate of tariffs contracted by GUVNL under Competitive Bidding plus Rs. 0.20 per unit (tariffs to be reviewed every six months)
-GERC has already approved the mechanism of tariff